Reports & Data

View and download Images, Reports and Data from this project.
Project files (Reports and Data) are listed first, and then Image files further down.
 

Project Files

Title File Description
2013 Tucannon Programmatic Annual ReportTucannon Programmatic - 2013 Annual Report.pdfSummary of habitat restoration projects conducted under the BPA-sponsored Tucannon Programmatic Habitat Project during FY 2013
2014 Tucannon PA 1&3 As-BuiltAs-Built Record Drawings_Tucannon River Project.pdf2014 Tucannon PA 1&3 As-Built Design
2014 Tucannon Programmatic Annual ReportTucannon Programmatic - 2014 Annual Report.pdfSummary of habitat restoration projects conducted under the BPA-sponsored Tucannon Programmatic Habitat Project during FY 2014
2014 Tucannon Restoration Effectiveness Monitoring ReportTucannon_RestorationEffectivenessMonitoring_2014FINAL.pdf2014 Tucannon Restoration Effectiveness Monitoring Report
2015 Tucannon Programmatic Annual Report 2018_Tucannon Programmatic_Annual_Report.pdf 2018 Tucannon Programmatic Annual ReportTucannon-Programmatic-2015-Annual-Report.pdfSummary of habitat restoration projects conducted under the BPA-sponsored Tucannon Programmatic Habitat Project during FY 2015
2017 ISRP Review Tucannon Programmatic2017 ISRP Review_Tucannon Programmatic_2-15-17.pptx2017 ISRP Review Tucannon Programmatic
2017 Tucannon Programmatic Annual Report2017-Tucannon_Programmatic_Annual_Summary.pdfSummary of habitat restoration projects conducted under the BPA-sponsored Tucannon Programmatic Habitat Project during FY 2017
2018 Tucannon Programmatic Annual Report2018_Tucannon Programmatic_Annual_Report.pdfSummary of habitat restoration projects conducted under the BPA-sponsored Tucannon Programmatic Habitat Project during FY 2018
2019 Tucannon Programmatic Habitat ReportTucannon Programmatic Habitat-2019_Summary_vs.F.pdfSummary of habitat restoration projects conducted under the BPA-sponsored Tucannon Programmatic Habitat Project during FY 2019
2020 Tucannon Programmatic Habitat ReportTucannon Programmatic Habitat-2020_Summary_vs.Final.pdfSummary of habitat restoration projects conducted under the BPA-sponsored Tucannon Programmatic Habitat Project during FY 2020
AnchorQEA_Lidar Analysis Presentation to RTT_10.19.2210-19 RTT Presentation.pptxPresentation
CTUIR Tucannon_PA 18 - Design - 6.2017CTUIR PA18 2017 Restoration Design.pdfDesign
CTUIR_Tucannon_PA 27-28 Phase 2 - 80percent design- 7.18.21CTUIR Tucannon_PA27-28.1_80percent design_7.18.21.pdfDesign
CTUIR_Tucannon_PA 3 - helicopter wood - final design - 7.17.18PA-3 Structures 3-61 compiled 7.17.18.docxDesign
Estimating outmigrant and overwinter survival of juvenile spring Chinook salmon in the Tucannon RiverTucannon_2013_Parr_Survival_final_2_20_15.docx2015 WDFW Study
GreenRidge1LWD_Pt..csvLWDpoints
GreenRidge2LWD_Pt..zipLWDpoint
GreenRidge3LWD_Pt.kmzLWDpoints
Integrated Species Restoration Prioritization for the Tucannon RiverIntegration-Species-Restoration-Prioritization-Tucannon-River-November-2012.pdfNovember 2012
Kris Fischer Salmon Recovery Conference PresentationKris Fischer_Tucannon_Salmon Recovery Conference 2023_3.2.23.pptxSRC Presentation
LiDAR Remote Sensing Data Collection: Tucannon River, Tucannon Headwaters, and Cummins Creek, WATucannon_River_LiDAR_Report_2010.pdfJuly 2010
NPT - Call To Action - Snake River Quasi-Extinction ThresholdNPT - 2021 Alarm and Call to Action (NPT to NPCC 5-5-21).pptxNez Perce Tribe Quasi-Extinction Threshold
NV5 Riverine Symposium PPTKris Fischer_2023 NV5 Riverine Symposium_3.20.23.pptxNV5 Riverine Sym PPT
PA 3 Floodplain MonitoringBefore-After high flow pictures in low FP - 2019-2022 update.pptxPhoto monitoring
Phase 2 Report of the Columbia Basin Partnership Task Force of the Marine Fisheries Advisory CommitteeNOAA_CBP_Phase2Report_ExSummary_508.pdfExecutive Summary- A vision for Salmon and Steelhead: GOals to Restore THriving Salmon and Steelhead to the Columbia River Basin
Phase 2 Report of the Columbia Basin Partnership Task Force of the Marine Fisheries Advisory CommitteeMAFAC_CBP_Phase2_Appendix-C_BiologicalAnalysis_Final_20200829_508.pdfAppendix C: Biological Analysis- A vision for Salmon and Steelhead: GOals to Restore THriving Salmon and Steelhead to the Columbia River Basin
Phase 2 Report of the Columbia Basin Partnership Task Force of the Marine Fisheries Advisory CommitteeMAFAC_CBP_Phase2_Appendix-D_SERAWorkshopSummaryMemo_2019_508.pdfAppendix D: CAFAC CBP Task Force SCEE Relationship FLow Mapping Excercise- A vision for Salmon and Steelhead: GOals to Restore THriving Salmon and Steelhead to the Columbia River Basin
Phase 2 Report of the Columbia Basin Partnership Task Force of the Marine Fisheries Advisory CommitteeMAFAC_CRB_Phase2ReportFinal_508.pdfFinal Report- A vision for Salmon and Steelhead: GOals to Restore THriving Salmon and Steelhead to the Columbia River Basin
Sediment Transport, Water Quality and Changing Bed Conditions in the Tucannon River, SE WashingtonHecht_et_al.1982 - Sediment_Transport_Water_Quality_and_Changing_bed_conditions_Tucannon_River.pdf1982 SCS Report
Snake River Salmon Recovery Plan 2011Full-Version-SE-WA-recovery-plan-121211.pdfThis recovery plan addresses the following salmon and trout populations in southeast Washington: bull trout, Asotin Creek summer steelhead, Asotin Creek spring/summer Chinook, Tucannon River summer steelhead, Tucannon River spring/summer Chinook, Wala Walla River summer steelhead, Touchet River summer steelhead, Joseph Creek summer steelhead, Lower Grande Ronde River summer steelhead, and Wenaha River spring/summer Chinook.
Snake River Salmon Recovery Region Provisional 3-5 Year Work Plan 20213-5-Year-Provisional-Habitat-Restoration-Plan-2021.pdfThe Snake River Salmon Region – Provisional Work plan is produced by the Snake River Salmon Recovery Board (SRSRB) as a guide for salmon and steelhead recovery actions within the Snake River Region. The SRSRB Regional Technical Team (RTT) has developed and prioritized the actions and projects for habitat restoration, habitat assessments, research monitoring and evaluation, hatchery and information education and policy listed in the tables provided in this document. Recovery priorities are reviewed annually and new priority projects are identified, making the work plan a living document.
SRSRB Board Presentation 12.14.21SRSRB_Presentation on PA27-28.1_12.14.21 (final).pptxProject Area 27/28.1 update
Tucannon Floodplain reunification MonitoringBefore-After high flow pictures - 2019-2020.pptxDays of inundation
Tucannon PA 27-28 Phase 3 - 80 percent design plansTUCANNON-PA 27-28 Phase 3 - 80 percent Design Plans_3.20.23.pdfdesign
Tucannon PA 5-15 Assessment and Conceptual designWolf Water Resources_Tucannon PA 5-15 Assessment and Conceptual Design_4.4.23.pdfAssessment and Design Proposal
Tucannon PA1 and PA3 60 percent designTucannon River Project_PA1 and PA3_60 percent Design Report.pdf60 percent design
Tucannon Programmatic Habitat 2020_Summary_for _krisTucannon Programmatic Habitat-2020_Summary_vs.Final_for_kris.docx
Tucannon River - Widths, Vegetative Environment and Conditions Shaping Its Condition, Mouth to HeadwatersBeckham_1995_Tucannon River - Widths, Vegetative Environment, and Conditions Shaping it Condition, Mouth to Headwaters.pdf1995 Cadastral Survey Report
Tucannon River and Pataha Creek Temperature Total Maximum Daily Load 2010WA Ecology TMDL report for Tucannon and Pataha.pdfWater quality improvement report and implementation plan, State of Washington Department of Ecology July 2010
Tucannon River Geomorphic Assessment and Habitat Restoration StudyTucannon-River-Geomorphic-Assessment-Habitat-Restoration-Study-April-2011-Report with Appendix.pdfApril 2011
Tucannon_PA 27-28_Phase 3_80 percent BDR_3.28.23Tucannon_ PA 27-28_Phase 3_ BDR_80 percent_3.28.23.pdfPhase 3 BDR
Tucannon_PA 27-28_Phase 3_Alternatives Analysis_3.28.23Tucannon_PA 27-28_Phase 3_Alternatives Analysis_3.28.23.pdfPhase 3_Alternatives
Tucannon_PA 27-28_Phase 3_Modeling Results_3.28.23Tucannon_PA 27-28_Phase 3_Modeling Results_3.28.23.pdfPhase 3_Modeling Results
Tucannon_PA 27-28_Phase 3_Wood Stability Calculations_3.28.23Tucannon_PA 27-28_Phase 3_Appendix G - Wood Stability Calculations_3.28.23.pdfPhase 3_Wood Stability Calculations
WDFW - 2022 spC return and 2023 ForcastWDFW_Bumgarner_Tuc SPCH for Implementors Meeting 2023.pptxTucannon spring Chinook 2022 return and 2023 forecast
WDFW WT Wooten Floodplain Mgmt Plan 2012Wooten Floodplain MGMT Plan - 11.8.2012.pdfWooten Floodplain Mgmt Plan 2012

Image Files

Title File Description
Tucannon Basin Spring Chinook Spawning AreasA map image of the Tucannon River Basin delineating spring Chinook spawning areas and priority restoration reaches.
Tucannon in the Traditional Use AreaAn overview of the Tucannon Basin in relation to the CTUIR traditional use area.
Tucannon River BasinMap of the Tucannon River Basin