Reports & Data

View and download Images, Reports and Data from this project.
Project files (Reports and Data) are listed first, and then Image files further down. 

Project Files

Title File Description
2008_2009AnnualReport.pdf 2008_2009AnnualReport.pdf 2008_2009AnnualReport.pdf
2009_2012AnnualReport.pdf 2009_2012AnnualReport.pdf 2009_2012AnnualReport.pdf
2009_2012AnnualReport_2.pdf 2009_2012AnnualReport_2.pdf 2009_2012AnnualReport_2.pdf
2011_2012AnnualReport.pdf 2011_2012AnnualReport.pdf 2011_2012AnnualReport.pdf
2013_2014AnnualReport.pdf 2013_2014AnnualReport.pdf 2013_2014AnnualReport.pdf
2013_2014AnnualReport_2.pdf 2013_2014AnnualReport_2.pdf 2013_2014AnnualReport_2.pdf
2014 Tucannon PA 1&3 As-Built As-Built Record Drawings_Tucannon River Project.pdf 2014 Tucannon PA 1&3 As-Built Design
2014 Tucannon Restoration Effectiveness Monitoring Report Tucannon_RestorationEffectivenessMonitoring_2014FINAL.pdf 2014 Tucannon Restoration Effectiveness Monitoring Report
2017 ISRP Review Tucannon Programmatic 2017 ISRP Review_Tucannon Programmatic_2-15-17.pptx 2017 ISRP Review Tucannon Programmatic
AnchorQEA_Lidar Analysis Presentation to RTT_10.19.22 10-19 RTT Presentation.pptx Presentation
Big 4 Conceptual Design Alternatives TucannonBig4ConceptDesignApp1AltSept2024.pdf Alternatives
Big 4 Conceptual Design BDR TucannonBig4ConceptDesignBDRSept2024.pdf BDR
CTUIR F&W Commission Presentation - Tucannon PA 5-15 Assessment CTUIR_F-WCommission-TucannonPA5-15Assessment.pptx PPT
CTUIR TUCANNON BASIN FISH HABITAT ENHANCEMENT PROJECT 2019-2020 BIANNUAL REPORT 2019-2021 CTUIR TUCANNON SUBBASIN RESTORATION PROJECT ANNUAL REPORT - Final 4.6.21.pdf Reporting on CTUIR TFHEP accomplishments and activities under BPA accords funding.
CTUIR Tucannon_PA 18 - Design - 6.2017 CTUIR PA18 2017 Restoration Design.pdf Design
CTUIR_Tucannon_PA 27-28 Phase 2 - 80percent design- 7.18.21 CTUIR Tucannon_PA27-28.1_80percent design_7.18.21.pdf Design
CTUIR_Tucannon_PA 3 - helicopter wood - final design - 7.17.18 PA-3 Structures 3-61 compiled 7.17.18.docx Design
Estimating outmigrant and overwinter survival of juvenile spring Chinook salmon in the Tucannon River Tucannon_2013_Parr_Survival_final_2_20_15.docx 2015 WDFW Study
GreenRidge1 LWD_Pt..csv LWDpoints
GreenRidge2 LWD_Pt..zip LWDpoint
GreenRidge3 LWD_Pt.kmz LWDpoints
Integrated Species Restoration Prioritization for the Tucannon River Integration-Species-Restoration-Prioritization-Tucannon-River-November-2012.pdf November 2012
Kris Fischer Salmon Recovery Conference Presentation Kris Fischer_Tucannon_Salmon Recovery Conference 2023_3.2.23.pptx SRC Presentation
LiDAR Remote Sensing Data Collection: Tucannon River, Tucannon Headwaters, and Cummins Creek, WA Tucannon_River_LiDAR_Report_2010.pdf July 2010
NPT - Call To Action - Snake River Quasi-Extinction Threshold NPT - 2021 Alarm and Call to Action (NPT to NPCC 5-5-21).pptx Nez Perce Tribe Quasi-Extinction Threshold
NV5 Riverine Symposium PPT Kris Fischer_2023 NV5 Riverine Symposium_3.20.23.pptx NV5 Riverine Sym PPT
PA 3 Floodplain Monitoring Before-After high flow pictures in low FP - 2019-2022 update.pptx Photo monitoring
Phase 2 Report of the Columbia Basin Partnership Task Force of the Marine Fisheries Advisory Committee NOAA_CBP_Phase2Report_ExSummary_508.pdf Executive Summary- A vision for Salmon and Steelhead: GOals to Restore THriving Salmon and Steelhead to the Columbia River Basin
Phase 2 Report of the Columbia Basin Partnership Task Force of the Marine Fisheries Advisory Committee MAFAC_CBP_Phase2_Appendix-C_BiologicalAnalysis_Final_20200829_508.pdf Appendix C: Biological Analysis- A vision for Salmon and Steelhead: GOals to Restore THriving Salmon and Steelhead to the Columbia River Basin
Phase 2 Report of the Columbia Basin Partnership Task Force of the Marine Fisheries Advisory Committee MAFAC_CBP_Phase2_Appendix-D_SERAWorkshopSummaryMemo_2019_508.pdf Appendix D: CAFAC CBP Task Force SCEE Relationship FLow Mapping Excercise- A vision for Salmon and Steelhead: GOals to Restore THriving Salmon and Steelhead to the Columbia River Basin
Phase 2 Report of the Columbia Basin Partnership Task Force of the Marine Fisheries Advisory Committee MAFAC_CRB_Phase2ReportFinal_508.pdf Final Report- A vision for Salmon and Steelhead: GOals to Restore THriving Salmon and Steelhead to the Columbia River Basin
Sediment Transport, Water Quality and Changing Bed Conditions in the Tucannon River, SE Washington Hecht_et_al.1982 - Sediment_Transport_Water_Quality_and_Changing_bed_conditions_Tucannon_River.pdf 1982 SCS Report
Snake River Salmon Recovery Plan 2011 Full-Version-SE-WA-recovery-plan-121211.pdf This recovery plan addresses the following salmon and trout populations in southeast Washington: bull trout, Asotin Creek summer steelhead, Asotin Creek spring/summer Chinook, Tucannon River summer steelhead, Tucannon River spring/summer Chinook, Wala Walla River summer steelhead, Touchet River summer steelhead, Joseph Creek summer steelhead, Lower Grande Ronde River summer steelhead, and Wenaha River spring/summer Chinook.
Snake River Salmon Recovery Region Provisional 3-5 Year Work Plan 2021 3-5-Year-Provisional-Habitat-Restoration-Plan-2021.pdf The Snake River Salmon Region – Provisional Work plan is produced by the Snake River Salmon Recovery Board (SRSRB) as a guide for salmon and steelhead recovery actions within the Snake River Region. The SRSRB Regional Technical Team (RTT) has developed and prioritized the actions and projects for habitat restoration, habitat assessments, research monitoring and evaluation, hatchery and information education and policy listed in the tables provided in this document. Recovery priorities are reviewed annually and new priority projects are identified, making the work plan a living document.
SRSRB Board Presentation 12.14.21 SRSRB_Presentation on PA27-28.1_12.14.21 (final).pptx Project Area 27/28.1 update
Tucannon Big 4 - 60 % Design 6.10.25 Tucannon_Big_Four_60p_Plans.pdf 60 % Design
Tucannon Big 4 60% Alternative Figures - 6.10.25 Tucannon_Big_Four_Alternative_Figures.pdf Alternatives
Tucannon Big 4 60% BOR Risk and Stability Calcs - 6.10.25 Tucannon_Big_Four_BOR_Risk_and_Stability_Calcs.pdf Stability Calcs
Tucannon Big 4 60% Model Figures - 6.10.25 Tucannon_Big_Four_Model_Figures.pdf Model Figures
Tucannon Big 4 60% Wetland Determination - 6.10.25 Tucannon_Big_Four_Wetland_Determination_Draft.pdf Wetland
Tucannon Big 4 Conceptual Design 9-2024 TucannonBig4ConceptDesignApp2PlansSept2024.pdf Big 4 Conceptual Design
Tucannon Big 4 Floodplain Restoration Project 30% Design 12.3.24 Tucannon_Big4_30percentDesign_Plans_12-3-24.pdf 30% Design
Tucannon Big 4 Floodplain Restoration Project 30% Design BDR 12.3.24 Tucannon_Big4_30percentDesign_BDR_12-3-24.pdf 30% BDR
Tucannon Big Four Floodplain Restoration Project W2r_Tucannon Big Four_Preliminary Design_Plans_05142024.pdf Preliminary Design
Tucannon Campground Alternative TucannonCampgroundsAlternativesAnalysis.pdf Space Analysis
Tucannon Campground Flood vs Recreation timing Tuc5-15FloodsandRecTiming.pdf floodplain space
Tucannon Campground space assessment SpaceSlidesUSFS-CGFieldTrip.pdf floodplain space
Tucannon Floodplain reunification Monitoring Before-After high flow pictures - 2019-2020.pptx Days of inundation
Tucannon Habitat Project_SemiAnnualReportBPAAccords_20152016 CTUIR TFHP Progress Report (2-year) for 2015 and 2016 - Final Draft.pdf 2015-2016 Annual Report
Tucannon Habitat Project_SemiAnnualReportBPAAccords_20172018 CTUIR TFHP - BPA Progress Report (2-year) for 2017 and 2018 FINAL.pdf 2017-2018 SemiAnnual Report
Tucannon PA 27/28 Public Billboard PA28 construction informational sign V5 - kf.pub Billboard
Tucannon PA 27-28 Phase 3 - 80 percent design plans TUCANNON-PA 27-28 Phase 3 - 80 percent Design Plans_3.20.23.pdf design
Tucannon PA 5-15 Assessment and Conceptual design Wolf Water Resources_Tucannon PA 5-15 Assessment and Conceptual Design_4.4.23.pdf Assessment and Design Proposal
Tucannon PA1 and PA3 60 percent design Tucannon River Project_PA1 and PA3_60 percent Design Report.pdf 60 percent design
Tucannon Programmatic Annual Report 2011 Tucannon_Programmatic_2011_Report.pdf this is the Tucannon programmatic 2010-077-00 annual restoration report
Tucannon Programmatic Annual Report 2012 Tucannon_Programmatic_2012_Report.pdf Tucannon programmatic 2010-077-00 annual habitat report
Tucannon Programmatic Annual Report 2013 Tucannon Programmatic - 2013 Annual Report.pdf Summary of habitat restoration projects conducted under the BPA-sponsored Tucannon Programmatic Habitat Project during FY 2013
Tucannon Programmatic Annual Report 2014 Tucannon Programmatic - 2014 Annual Report.pdf Summary of habitat restoration projects conducted under the BPA-sponsored Tucannon Programmatic Habitat Project during FY 2014
Tucannon Programmatic Annual Report 2015 Tucannon-Programmatic-2015-Annual-Report.pdf Summary of habitat restoration projects conducted under the BPA-sponsored Tucannon Programmatic Habitat Project during FY 2015
Tucannon Programmatic Annual Report 2016 Tucannon_Programmatic_2017_Report.pdf Tucannon programmatic 2010-077-00 habitat restoration report 2016
Tucannon Programmatic Annual Report 2017 2017-Tucannon_Programmatic_Annual_Summary.pdf Summary of habitat restoration projects conducted under the BPA-sponsored Tucannon Programmatic Habitat Project during FY 2017
Tucannon Programmatic Annual Report 2018 2018_Tucannon Programmatic_Annual_Report.pdf Summary of habitat restoration projects conducted under the BPA-sponsored Tucannon Programmatic Habitat Project during FY 2018
Tucannon Programmatic Annual Report 2019 Tucannon Programmatic Habitat-2019_Summary_vs.F.pdf Summary of habitat restoration projects conducted under the BPA-sponsored Tucannon Programmatic Habitat Project during FY 2019
Tucannon Programmatic Annual Report 2020 Tucannon Programmatic Habitat-2020_Summary_vs.Final_for_kris.docx
Tucannon Programmatic Annual Report 2021 Tucannon_Programmatic_2021_Annual_Report.pdf Annual Report for Tucannon Programmatic 2010-077-00
Tucannon Programmatic Annual Report 2022 Tucannon_Program_2010-077-00_Report_2022.pdf Tucannon program annual report for work in 2022
Tucannon Programmatic Annual Report 2023 Tucannon_Program_2010-077-00_Report_2023.docx Tucannon habitat programmatic Annual Report 2023
Tucannon Programmatic Habitat Annual Report 2020 Tucannon Programmatic Habitat-2020_Summary_vs.Final.pdf Summary of habitat restoration projects conducted under the BPA-sponsored Tucannon Programmatic Habitat Project during FY 2020
Tucannon Retreat CTUIR_Tucannon_Retreat_6-17-24.pptx PPT
Tucannon River - State of the Floodplain Attachment A - Tucannon State of the Floodplain.pdf Tucannon Assessment Map
Tucannon River - Widths, Vegetative Environment and Conditions Shaping Its Condition, Mouth to Headwaters Beckham_1995_Tucannon River - Widths, Vegetative Environment, and Conditions Shaping it Condition, Mouth to Headwaters.pdf 1995 Cadastral Survey Report
Tucannon River and Pataha Creek Temperature Total Maximum Daily Load 2010 WA Ecology TMDL report for Tucannon and Pataha.pdf Water quality improvement report and implementation plan, State of Washington Department of Ecology July 2010
Tucannon River Geomorphic Assessment and Habitat Restoration Study Tucannon-River-Geomorphic-Assessment-Habitat-Restoration-Study-April-2011-Report with Appendix.pdf April 2011
Tucannon_PA 27-28_Phase 3_80 percent BDR_3.28.23 Tucannon_ PA 27-28_Phase 3_ BDR_80 percent_3.28.23.pdf Phase 3 BDR
Tucannon_PA 27-28_Phase 3_Alternatives Analysis_3.28.23 Tucannon_PA 27-28_Phase 3_Alternatives Analysis_3.28.23.pdf Phase 3_Alternatives
Tucannon_PA 27-28_Phase 3_Modeling Results_3.28.23 Tucannon_PA 27-28_Phase 3_Modeling Results_3.28.23.pdf Phase 3_Modeling Results
Tucannon_PA 27-28_Phase 3_Wood Stability Calculations_3.28.23 Tucannon_PA 27-28_Phase 3_Appendix G - Wood Stability Calculations_3.28.23.pdf Phase 3_Wood Stability Calculations
WDFW - 2022 spC return and 2023 Forcast WDFW_Bumgarner_Tuc SPCH for Implementors Meeting 2023.pptx Tucannon spring Chinook 2022 return and 2023 forecast
WDFW WT Wooten Floodplain Mgmt Plan 2012 Wooten Floodplain MGMT Plan - 11.8.2012.pdf Wooten Floodplain Mgmt Plan 2012

Image Files

Title File Description
Tucannon Basin Spring Chinook Spawning Areas Tucannon Basin Spring Chinook Spawning Areas A map image of the Tucannon River Basin delineating spring Chinook spawning areas and priority restoration reaches.
Tucannon in the Traditional Use Area Tucannon in the Traditional Use Area An overview of the Tucannon Basin in relation to the CTUIR traditional use area.
Tucannon River Basin Tucannon River Basin Map of the Tucannon River Basin