View and download Images, Reports and Data from this project.
Project files (Reports and Data) are listed first, and then Image files further down.
Project Files
| Title | File | Description |
|---|---|---|
| 2008_2009AnnualReport.pdf | 2008_2009AnnualReport.pdf | 2008_2009AnnualReport.pdf |
| 2009_2012AnnualReport.pdf | 2009_2012AnnualReport.pdf | 2009_2012AnnualReport.pdf |
| 2009_2012AnnualReport_2.pdf | 2009_2012AnnualReport_2.pdf | 2009_2012AnnualReport_2.pdf |
| 2011_2012AnnualReport.pdf | 2011_2012AnnualReport.pdf | 2011_2012AnnualReport.pdf |
| 2013_2014AnnualReport.pdf | 2013_2014AnnualReport.pdf | 2013_2014AnnualReport.pdf |
| 2013_2014AnnualReport_2.pdf | 2013_2014AnnualReport_2.pdf | 2013_2014AnnualReport_2.pdf |
| 2014 Tucannon PA 1&3 As-Built | As-Built Record Drawings_Tucannon River Project.pdf | 2014 Tucannon PA 1&3 As-Built Design |
| 2014 Tucannon Restoration Effectiveness Monitoring Report | Tucannon_RestorationEffectivenessMonitoring_2014FINAL.pdf | 2014 Tucannon Restoration Effectiveness Monitoring Report |
| 2017 ISRP Review Tucannon Programmatic | 2017 ISRP Review_Tucannon Programmatic_2-15-17.pptx | 2017 ISRP Review Tucannon Programmatic |
| AnchorQEA_Lidar Analysis Presentation to RTT_10.19.22 | 10-19 RTT Presentation.pptx | Presentation |
| Big 4 Conceptual Design Alternatives | TucannonBig4ConceptDesignApp1AltSept2024.pdf | Alternatives |
| Big 4 Conceptual Design BDR | TucannonBig4ConceptDesignBDRSept2024.pdf | BDR |
| CTUIR F&W Commission Presentation - Tucannon PA 5-15 Assessment | CTUIR_F-WCommission-TucannonPA5-15Assessment.pptx | PPT |
| CTUIR TUCANNON BASIN FISH HABITAT ENHANCEMENT PROJECT 2019-2020 BIANNUAL REPORT | 2019-2021 CTUIR TUCANNON SUBBASIN RESTORATION PROJECT ANNUAL REPORT - Final 4.6.21.pdf | Reporting on CTUIR TFHEP accomplishments and activities under BPA accords funding. |
| CTUIR Tucannon_PA 18 - Design - 6.2017 | CTUIR PA18 2017 Restoration Design.pdf | Design |
| CTUIR_Tucannon_PA 27-28 Phase 2 - 80percent design- 7.18.21 | CTUIR Tucannon_PA27-28.1_80percent design_7.18.21.pdf | Design |
| CTUIR_Tucannon_PA 3 - helicopter wood - final design - 7.17.18 | PA-3 Structures 3-61 compiled 7.17.18.docx | Design |
| Estimating outmigrant and overwinter survival of juvenile spring Chinook salmon in the Tucannon River | Tucannon_2013_Parr_Survival_final_2_20_15.docx | 2015 WDFW Study |
| GreenRidge1 | LWD_Pt..csv | LWDpoints |
| GreenRidge2 | LWD_Pt..zip | LWDpoint |
| GreenRidge3 | LWD_Pt.kmz | LWDpoints |
| Integrated Species Restoration Prioritization for the Tucannon River | Integration-Species-Restoration-Prioritization-Tucannon-River-November-2012.pdf | November 2012 |
| Kris Fischer Salmon Recovery Conference Presentation | Kris Fischer_Tucannon_Salmon Recovery Conference 2023_3.2.23.pptx | SRC Presentation |
| LiDAR Remote Sensing Data Collection: Tucannon River, Tucannon Headwaters, and Cummins Creek, WA | Tucannon_River_LiDAR_Report_2010.pdf | July 2010 |
| NPT - Call To Action - Snake River Quasi-Extinction Threshold | NPT - 2021 Alarm and Call to Action (NPT to NPCC 5-5-21).pptx | Nez Perce Tribe Quasi-Extinction Threshold |
| NV5 Riverine Symposium PPT | Kris Fischer_2023 NV5 Riverine Symposium_3.20.23.pptx | NV5 Riverine Sym PPT |
| PA 3 Floodplain Monitoring | Before-After high flow pictures in low FP - 2019-2022 update.pptx | Photo monitoring |
| Phase 2 Report of the Columbia Basin Partnership Task Force of the Marine Fisheries Advisory Committee | NOAA_CBP_Phase2Report_ExSummary_508.pdf | Executive Summary- A vision for Salmon and Steelhead: GOals to Restore THriving Salmon and Steelhead to the Columbia River Basin |
| Phase 2 Report of the Columbia Basin Partnership Task Force of the Marine Fisheries Advisory Committee | MAFAC_CBP_Phase2_Appendix-C_BiologicalAnalysis_Final_20200829_508.pdf | Appendix C: Biological Analysis- A vision for Salmon and Steelhead: GOals to Restore THriving Salmon and Steelhead to the Columbia River Basin |
| Phase 2 Report of the Columbia Basin Partnership Task Force of the Marine Fisheries Advisory Committee | MAFAC_CBP_Phase2_Appendix-D_SERAWorkshopSummaryMemo_2019_508.pdf | Appendix D: CAFAC CBP Task Force SCEE Relationship FLow Mapping Excercise- A vision for Salmon and Steelhead: GOals to Restore THriving Salmon and Steelhead to the Columbia River Basin |
| Phase 2 Report of the Columbia Basin Partnership Task Force of the Marine Fisheries Advisory Committee | MAFAC_CRB_Phase2ReportFinal_508.pdf | Final Report- A vision for Salmon and Steelhead: GOals to Restore THriving Salmon and Steelhead to the Columbia River Basin |
| Sediment Transport, Water Quality and Changing Bed Conditions in the Tucannon River, SE Washington | Hecht_et_al.1982 - Sediment_Transport_Water_Quality_and_Changing_bed_conditions_Tucannon_River.pdf | 1982 SCS Report |
| Snake River Salmon Recovery Plan 2011 | Full-Version-SE-WA-recovery-plan-121211.pdf | This recovery plan addresses the following salmon and trout populations in southeast Washington: bull trout, Asotin Creek summer steelhead, Asotin Creek spring/summer Chinook, Tucannon River summer steelhead, Tucannon River spring/summer Chinook, Wala Walla River summer steelhead, Touchet River summer steelhead, Joseph Creek summer steelhead, Lower Grande Ronde River summer steelhead, and Wenaha River spring/summer Chinook. |
| Snake River Salmon Recovery Region Provisional 3-5 Year Work Plan 2021 | 3-5-Year-Provisional-Habitat-Restoration-Plan-2021.pdf | The Snake River Salmon Region – Provisional Work plan is produced by the Snake River Salmon Recovery Board (SRSRB) as a guide for salmon and steelhead recovery actions within the Snake River Region. The SRSRB Regional Technical Team (RTT) has developed and prioritized the actions and projects for habitat restoration, habitat assessments, research monitoring and evaluation, hatchery and information education and policy listed in the tables provided in this document. Recovery priorities are reviewed annually and new priority projects are identified, making the work plan a living document. |
| SRSRB Board Presentation 12.14.21 | SRSRB_Presentation on PA27-28.1_12.14.21 (final).pptx | Project Area 27/28.1 update |
| Tucannon Big 4 - 60 % Design 6.10.25 | Tucannon_Big_Four_60p_Plans.pdf | 60 % Design |
| Tucannon Big 4 60% Alternative Figures - 6.10.25 | Tucannon_Big_Four_Alternative_Figures.pdf | Alternatives |
| Tucannon Big 4 60% BOR Risk and Stability Calcs - 6.10.25 | Tucannon_Big_Four_BOR_Risk_and_Stability_Calcs.pdf | Stability Calcs |
| Tucannon Big 4 60% Model Figures - 6.10.25 | Tucannon_Big_Four_Model_Figures.pdf | Model Figures |
| Tucannon Big 4 60% Wetland Determination - 6.10.25 | Tucannon_Big_Four_Wetland_Determination_Draft.pdf | Wetland |
| Tucannon Big 4 Conceptual Design 9-2024 | TucannonBig4ConceptDesignApp2PlansSept2024.pdf | Big 4 Conceptual Design |
| Tucannon Big 4 Floodplain Restoration Project 30% Design 12.3.24 | Tucannon_Big4_30percentDesign_Plans_12-3-24.pdf | 30% Design |
| Tucannon Big 4 Floodplain Restoration Project 30% Design BDR 12.3.24 | Tucannon_Big4_30percentDesign_BDR_12-3-24.pdf | 30% BDR |
| Tucannon Big Four Floodplain Restoration Project | W2r_Tucannon Big Four_Preliminary Design_Plans_05142024.pdf | Preliminary Design |
| Tucannon Campground Alternative | TucannonCampgroundsAlternativesAnalysis.pdf | Space Analysis |
| Tucannon Campground Flood vs Recreation timing | Tuc5-15FloodsandRecTiming.pdf | floodplain space |
| Tucannon Campground space assessment | SpaceSlidesUSFS-CGFieldTrip.pdf | floodplain space |
| Tucannon Floodplain reunification Monitoring | Before-After high flow pictures - 2019-2020.pptx | Days of inundation |
| Tucannon Habitat Project_SemiAnnualReportBPAAccords_20152016 | CTUIR TFHP Progress Report (2-year) for 2015 and 2016 - Final Draft.pdf | 2015-2016 Annual Report |
| Tucannon Habitat Project_SemiAnnualReportBPAAccords_20172018 | CTUIR TFHP - BPA Progress Report (2-year) for 2017 and 2018 FINAL.pdf | 2017-2018 SemiAnnual Report |
| Tucannon PA 27/28 Public Billboard | PA28 construction informational sign V5 - kf.pub | Billboard |
| Tucannon PA 27-28 Phase 3 - 80 percent design plans | TUCANNON-PA 27-28 Phase 3 - 80 percent Design Plans_3.20.23.pdf | design |
| Tucannon PA 5-15 Assessment and Conceptual design | Wolf Water Resources_Tucannon PA 5-15 Assessment and Conceptual Design_4.4.23.pdf | Assessment and Design Proposal |
| Tucannon PA1 and PA3 60 percent design | Tucannon River Project_PA1 and PA3_60 percent Design Report.pdf | 60 percent design |
| Tucannon Programmatic Annual Report 2011 | Tucannon_Programmatic_2011_Report.pdf | this is the Tucannon programmatic 2010-077-00 annual restoration report |
| Tucannon Programmatic Annual Report 2012 | Tucannon_Programmatic_2012_Report.pdf | Tucannon programmatic 2010-077-00 annual habitat report |
| Tucannon Programmatic Annual Report 2013 | Tucannon Programmatic - 2013 Annual Report.pdf | Summary of habitat restoration projects conducted under the BPA-sponsored Tucannon Programmatic Habitat Project during FY 2013 |
| Tucannon Programmatic Annual Report 2014 | Tucannon Programmatic - 2014 Annual Report.pdf | Summary of habitat restoration projects conducted under the BPA-sponsored Tucannon Programmatic Habitat Project during FY 2014 |
| Tucannon Programmatic Annual Report 2015 | Tucannon-Programmatic-2015-Annual-Report.pdf | Summary of habitat restoration projects conducted under the BPA-sponsored Tucannon Programmatic Habitat Project during FY 2015 |
| Tucannon Programmatic Annual Report 2016 | Tucannon_Programmatic_2017_Report.pdf | Tucannon programmatic 2010-077-00 habitat restoration report 2016 |
| Tucannon Programmatic Annual Report 2017 | 2017-Tucannon_Programmatic_Annual_Summary.pdf | Summary of habitat restoration projects conducted under the BPA-sponsored Tucannon Programmatic Habitat Project during FY 2017 |
| Tucannon Programmatic Annual Report 2018 | 2018_Tucannon Programmatic_Annual_Report.pdf | Summary of habitat restoration projects conducted under the BPA-sponsored Tucannon Programmatic Habitat Project during FY 2018 |
| Tucannon Programmatic Annual Report 2019 | Tucannon Programmatic Habitat-2019_Summary_vs.F.pdf | Summary of habitat restoration projects conducted under the BPA-sponsored Tucannon Programmatic Habitat Project during FY 2019 |
| Tucannon Programmatic Annual Report 2020 | Tucannon Programmatic Habitat-2020_Summary_vs.Final_for_kris.docx | |
| Tucannon Programmatic Annual Report 2021 | Tucannon_Programmatic_2021_Annual_Report.pdf | Annual Report for Tucannon Programmatic 2010-077-00 |
| Tucannon Programmatic Annual Report 2022 | Tucannon_Program_2010-077-00_Report_2022.pdf | Tucannon program annual report for work in 2022 |
| Tucannon Programmatic Annual Report 2023 | Tucannon_Program_2010-077-00_Report_2023.docx | Tucannon habitat programmatic Annual Report 2023 |
| Tucannon Programmatic Habitat Annual Report 2020 | Tucannon Programmatic Habitat-2020_Summary_vs.Final.pdf | Summary of habitat restoration projects conducted under the BPA-sponsored Tucannon Programmatic Habitat Project during FY 2020 |
| Tucannon Retreat | CTUIR_Tucannon_Retreat_6-17-24.pptx | PPT |
| Tucannon River - State of the Floodplain | Attachment A - Tucannon State of the Floodplain.pdf | Tucannon Assessment Map |
| Tucannon River - Widths, Vegetative Environment and Conditions Shaping Its Condition, Mouth to Headwaters | Beckham_1995_Tucannon River - Widths, Vegetative Environment, and Conditions Shaping it Condition, Mouth to Headwaters.pdf | 1995 Cadastral Survey Report |
| Tucannon River and Pataha Creek Temperature Total Maximum Daily Load 2010 | WA Ecology TMDL report for Tucannon and Pataha.pdf | Water quality improvement report and implementation plan, State of Washington Department of Ecology July 2010 |
| Tucannon River Geomorphic Assessment and Habitat Restoration Study | Tucannon-River-Geomorphic-Assessment-Habitat-Restoration-Study-April-2011-Report with Appendix.pdf | April 2011 |
| Tucannon_PA 27-28_Phase 3_80 percent BDR_3.28.23 | Tucannon_ PA 27-28_Phase 3_ BDR_80 percent_3.28.23.pdf | Phase 3 BDR |
| Tucannon_PA 27-28_Phase 3_Alternatives Analysis_3.28.23 | Tucannon_PA 27-28_Phase 3_Alternatives Analysis_3.28.23.pdf | Phase 3_Alternatives |
| Tucannon_PA 27-28_Phase 3_Modeling Results_3.28.23 | Tucannon_PA 27-28_Phase 3_Modeling Results_3.28.23.pdf | Phase 3_Modeling Results |
| Tucannon_PA 27-28_Phase 3_Wood Stability Calculations_3.28.23 | Tucannon_PA 27-28_Phase 3_Appendix G - Wood Stability Calculations_3.28.23.pdf | Phase 3_Wood Stability Calculations |
| WDFW - 2022 spC return and 2023 Forcast | WDFW_Bumgarner_Tuc SPCH for Implementors Meeting 2023.pptx | Tucannon spring Chinook 2022 return and 2023 forecast |
| WDFW WT Wooten Floodplain Mgmt Plan 2012 | Wooten Floodplain MGMT Plan - 11.8.2012.pdf | Wooten Floodplain Mgmt Plan 2012 |